How Many Agents Do I Need? Staffing an Interval With Erlang C
"How many agents do I need?" has a precise answer for one half-hour, once you know four things: how many calls arrive, how long they take, how long the interval is, and what service you want to give. This page walks through that calculation step by step with the call center staffing calculator, which uses the Erlang C model, and then shows how sensitive the answer is to each input.
Step 1: calls offered in the interval
Start with the number of calls you expect to be offered in the half-hour you are planning: every call that reaches the queue, including the ones that will be abandoned. Forecasting answered calls instead understates demand, because the intervals with the most abandoned calls are exactly the ones that were short of staff. The forecasting guide shows a simple method: average the same half-hour on the same weekday over recent weeks.
Example: 100 calls between 10:00 and 10:30 on a Monday.
Step 2: average handle time
Average handle time (AHT) is talk time plus hold time plus after-call work, divided by calls handled. Leave out the after-call work and you will understaff. Use the AHT for that time of day and that queue if you have it. See average handle time explained.
Example: 180 seconds.
Step 3: interval length
Most planning uses 30-minute intervals; some uses 15. Use the same length your forecast and your phone system's interval reports use.
Example: 30 minutes. The traffic in the interval is then A = 100 x 180 / 1,800 = 10.00 Erlangs: ten agents' worth of continuous work.
Step 4: the service target
A service level target has two parts: a percentage and a time. "80% of calls answered within 20 seconds" is a common target, but it is a convention that each business chooses, not a rule it must meet. A queue for urgent calls might aim higher; a queue where callers expect to wait might aim for a longer time. See service level and ASA.
Example: 80% in 20 seconds.
Step 5: the search
The calculator starts at the first staffing level that can keep up at all, which is the whole number just above the traffic: for 10.00 Erlangs that is 11 agents. It computes the service level Erlang C predicts for 11, and if that misses the target it tries 12, then 13, and so on until the target is met.
| Agents | Answered in 20 s | ASA | Occupancy | Meets 80/20? |
|---|---|---|---|---|
| 11 | 39.0% | 122.8 s | 90.9% | No |
| 12 | 64.0% | 40.4 s | 83.3% | No |
| 13 | 79.6% | 17.1 s | 76.9% | No, just short |
| 14 | 88.8% | 7.8 s | 71.4% | Yes |
Answer: 14 agents on the phones, giving 88.8% in 20 seconds, an average speed of answer of 7.8 seconds and occupancy of 71.4%. Thirteen agents get to 79.6%, which misses the target by less than half a point. That near miss is worth noticing: if your forecast is slightly high, 13 might do; if it is slightly low, 14 will be stretched. The Erlang C guide shows where each figure comes from.
How the answer moves with the target
Keep the same 100 calls and 180 seconds and change only the target:
- 90% in 20 seconds: 15 agents (94.1%).
- 80% in 20 seconds: 14 agents (88.8%).
- 80% in 60 seconds: 13 agents (89.5%).
Going from 80% to 90% costs one more agent in this interval; allowing callers 60 seconds instead of 20 saves one. Agree the target before you argue about headcount.
How the answer moves with volume and handle time
A 10% rise in calls (110 instead of 100) and a 10% rise in handle time (198 seconds instead of 180) have the same effect on the traffic: both give A = 11.00 Erlangs, and both need 15 agents instead of 14. If you stay at 14 agents, the wait time calculator shows service falling below target: 78.3% in 20 seconds with 110 calls, and 77.6% with the longer handle time. Handle time is as much a staffing input as volume, which is why a process change that adds 18 seconds to every call has a headcount cost.
Larger teams are more efficient: pooling
The same target needs proportionally fewer agents as traffic grows. At AHT 180 seconds, 30-minute intervals and 80% in 20 seconds:
| Calls per half-hour | Traffic (Erlangs) | Agents on the phones | Occupancy |
|---|---|---|---|
| 50 | 5.00 | 8 | 62.5% |
| 100 | 10.00 | 14 | 71.4% |
| 200 | 20.00 | 24 | 83.3% |
| 1,000 | 100.00 | 107 | 93.5% |
Doubling the calls from 100 to 200 needs 24 agents, not 28. The randomness of arrivals averages out in a larger pool, so each agent can be busier for the same service. The reverse is also true: splitting one team into two separate queues of 50 calls each needs 8 + 8 = 16 agents where one combined queue of 100 needs 14. See call routing explained.
One more example, for a larger and slower queue: 200 calls in 30 minutes at 240 seconds is 26.67 Erlangs, and needs 32 agents for 80% in 20 seconds (84.9%, ASA 10.6 seconds, occupancy 83.3%).
Step 6: from agents on the phones to agents to schedule
Erlang C answers one question: how many agents must be on the phones, ready to take calls, during that half-hour. It does not know about breaks, training, meetings, coaching, sickness or holiday. Those are shrinkage: paid time when agents are not available for calls.
The staffing calculator now takes a shrinkage figure (30% by default, which is only an example) and shows two results: agents on the phones and agents to schedule, where
agents to schedule = agents on the phones / (1 - shrinkage), rounded up.
For the example: 14 / 0.70 = 20 agents to schedule. A common mistake is to multiply instead: 14 x 1.30 = 18.2, so 19. But 19 people minus 30% shrinkage is 13.3 on the phones, below the 14 needed. Always divide. Use your own measured shrinkage, not the default; see shrinkage and occupancy.
Step 7: repeat for every interval
Erlang C sizes one interval at a time. Calls rise and fall through the day, so each half-hour needs its own forecast and its own run. A peak of 65 calls in 30 minutes at an AHT of 300 seconds, for instance, is 10.83 Erlangs and needs 15 on the phones (86.9%, occupancy 72.2%), which is 22 to schedule at 30% shrinkage. The daily total of agents is not the sum of these figures: the interval requirements become a set of shifts, which is covered in call center shift scheduling.
Checking the result
- Compare with last month. Pick a half-hour from your phone system's interval report, enter the calls offered, AHT and the number of agents actually on the phones into the call wait time calculator, and compare its service level with what was reported.
- Expect the model to be a little pessimistic. Erlang C assumes nobody hangs up, so when callers abandon, the real queue clears faster than the model predicts and it tends to overstate the staff needed.
- Watch the near misses. Where one agent separates a miss from a comfortable pass, small forecast errors matter most.
- Keep chat and email separate. They need their own handle times and targets.