The Erlang C model tells you how many agents must be on the phones in a half-hour. Two further numbers turn that into a workable plan. Shrinkage says how many more people you need to schedule, because paid time includes breaks, training and absence. Occupancy says how busy the agents on the phones will be, and why the answer depends on the size of the team. This page defines both, shows the right way to apply shrinkage (and the common wrong way), and explains what occupancy can and cannot tell you.
Shrinkage: paid time off the phones
shrinkage = paid time not available for calls / total paid time
What counts as "not available for calls":
- scheduled breaks and lunches (where paid),
- training, coaching and team meetings,
- one-on-one meetings and quality reviews,
- vacation, public holidays and other planned leave,
- sickness and other unplanned absence,
- other work away from the queue (projects, email, admin), if it takes agents off calls.
Worked example over a week for one agent paid 40 hours: 3 hours of breaks, 2 hours of training, 1.5 hours of meetings and coaching, and 5.5 hours of vacation and absence averaged across the team. That is 12 hours off the phones: 12 / 40 = 30%.
That 30% is an example, the same figure the call center staffing calculator uses as its default. It is not a benchmark or a typical value. Your own figure depends on your break rules, training plans, leave entitlements and absence, and it changes through the year. Measure it from your own records and use that.
Two refinements are worth making once the basic figure is in place:
- Shrinkage varies by interval. Breaks and meetings are placed at particular times, so the half-hour after lunch may lose more people than the first half-hour of the day.
- Planned and unplanned shrinkage behave differently. You control training and breaks; you can only estimate sickness. Track them separately and compare both with what actually happened every week.
Heads to schedule: divide, do not multiply
If a share of paid time goes to shrinkage, only the rest is available for calls. To have a given number on the phones, schedule:
agents to schedule = agents on the phones / (1 - shrinkage), rounded up.
Example: the staffing calculator's default interval (100 calls in 30 minutes, 180-second handle time, 80% answered within 20 seconds) needs 14 agents on the phones. At 30% shrinkage:
14 / (1 - 0.30) = 14 / 0.70 = 20 agents to schedule.
Check: 20 scheduled, less 30%, leaves 14 on the phones.
The multiply mistake
It is tempting to add 30% instead: 14 x 1.30 = 18.2, rounded up to 19. That leaves the interval short:
19 scheduled, less 30%, is 19 x 0.70 = 13.3 on the phones, below the 14 needed.
The gap grows as shrinkage grows, because adding a percentage of the on-phone number is not the same as making sure that percentage of the scheduled number can be lost. Always divide. The staffing calculator now does this for you: it shows agents on the phones and agents to schedule, using the shrinkage you enter.
| On the phones | Shrinkage | Divide (correct) | Multiply (short) |
|---|---|---|---|
| 14 | 30% | 20 | 19 |
| 15 | 30% | 22 | 20 |
| 8 | 30% | 12 | 11 |
(For 15: 15 / 0.70 = 21.4, so 22; 15 x 1.30 = 19.5, so 20. For 8: 8 / 0.70 = 11.4, so 12; 8 x 1.30 = 10.4, so 11.)
Occupancy: how busy the agents on the phones are
occupancy = traffic in Erlangs / agents on the phones = A / N
Occupancy is the share of agents' available time spent handling calls (talk, hold and after-call work), as opposed to waiting for the next call. It is measured against agents on the phones, not agents scheduled.
In the default example, A = 100 x 180 / 1,800 = 10.00 Erlangs, and 14 agents gives 10 / 14 = 71.4%.
Why occupancy rises with team size
At the same service target, larger teams run at higher occupancy. With AHT 180 seconds, 30-minute intervals and 80% answered within 20 seconds, the staffing calculator gives:
| Calls per half-hour | Traffic (Erlangs) | Agents on the phones | Occupancy |
|---|---|---|---|
| 20 | 2.00 | 4 | 50.0% |
| 50 | 5.00 | 8 | 62.5% |
| 100 | 10.00 | 14 | 71.4% |
| 200 | 20.00 | 24 | 83.3% |
| 1,000 | 100.00 | 107 | 93.5% |
Calls arrive at random. In a small team, a burst of three calls at once can tie up most of the agents, so the team needs a lot of spare capacity relative to its size. In a large team, bursts and lulls average out across many agents, so each agent can be busier for the same service. This is the pooling effect, and it is why splitting one queue into many small ones costs extra staff. See staffing one interval with Erlang C and the Erlang C guide.
Two consequences:
- Do not set one occupancy target for every team. A small team running at 50% may be correctly staffed for its service target; pushing it to the occupancy of a large team would mean long waits.
- Watch occupancy at the peaks. Daily averages hide the intervals where agents go from call to call with no gap.
Very high occupancy leaves no slack
Occupancy close to 100% means almost no time between calls. Operationally, that leaves no room for the short gap an agent may need after a difficult call, for coaching, for a quick word with a supervisor, or for absorbing a small rise in calls. Queues at very high occupancy are also very sensitive: in the Erlang C table for 10 Erlangs, dropping from 12 agents (83.3% occupancy) to 11 (90.9%) takes service from 64.0% to 39.0% answered within 20 seconds, as the call wait time calculator shows.
So keep occupancy from running very high for long periods, keep breaks in the schedule (placed in the quietest half-hours rather than cancelled at the peaks), and follow the local employment rules on breaks and working hours. See call center shift scheduling.
Shrinkage and occupancy together
They describe different slices of paid time:
- Paid time, minus shrinkage, gives time available for calls (agents on the phones).
- Time available for calls, times occupancy, gives time actually spent handling calls.
Continuing the example: 20 scheduled for the half-hour, 14 on the phones after 30% shrinkage, and 10 Erlangs of call work across those 14, which is 71.4% occupancy. Ten agents' worth of handling from 20 people scheduled. That is not waste: the other time is breaks, training, absence and the spare capacity that keeps waits short.
Checking your numbers
- Each week, compare planned shrinkage with actual, by category, and update the figure you use.
- Compare scheduled heads per interval with the number actually logged in and available. A gap means shrinkage, adherence or the schedule needs another look.
- Compare occupancy at the peaks with the occupancy the model predicted for the staffing you had.